Bangladesh Palli Bidyut Samity Job Circular 2022 | পল্লী বিদ্যুৎ

Bangladesh Palli Bidyut Samity Job Circular 2022 published recently. The main goal of the ‘Digital Bangladesh’ vision is to improve the living standards of the people by using technology. With this goal in mind, the Bangladesh Rural Electrification Board implemented various timely steps in the ICT sector. Bangladesh Palli Bidyut Samity details here. See the blew to circular. Bangladesh Palli Bidyut Samity Circular 2021. See more info in site of www.chakrirkbr.com.

বাংলাদেশ পল্লী বিদ্যুৎ সমিতি জব সার্কুলার ২০২২ সম্প্রতি প্রকাশিত। ‘ডিজিটাল বাংলাদেশ’ ভিশনের মূল লক্ষ্য প্রযুক্তি ব্যবহার করে জনগণের জীবনযাত্রার মান উন্নত করা। এই লক্ষ্যটিকে সামনে রেখে, বাংলাদেশ পল্লী বিদ্যুতায়ন বোর্ড আইসিটি সেক্টরে বিভিন্ন সময়োচিত পদক্ষেপগুলি বাস্তবায়ন করেছে। বাংলাদেশ পল্লী বিদ্যুৎ সমিতির বিশদ এখানে। বিজ্ঞপ্তিটি নিচে দেখুন।

With the slogan “Sheikh Hasina’s initiative, electricity in every house”, the government committed to provide electricity to every household in Bangladesh by 2020. Then the Pre-Payment Meter introduced in 2011 to utilize the generated electricity. And prevent wastage as well as to create automatic billing facility. At present, by modernizing the pre-payment meters and formulating the standard of online. So smart pre-payment meters, an initiative taken to purchase 1.0 crore pre-payment meters by 2025. Bangladesh Palli Bidyut Samity Circular 2021.

Bangladesh Palli Bidyut Samity Job Circular 2022

মৌলভীবাজার পল্লী বিদ্যুৎ সমিতি নিয়োগ ২০২২

Bangladesh Palli Bidyut Samity Job Circular 2022

পল্লী বিদ্যুৎ নিয়োগ বিজ্ঞপ্তি ২০২২

palli bidyut job circular 2022

palli bidyut job circular 2022

 

New Jobs Circular

বাংলাদেশ পল্লী বিদ্যুত নিয়োগ বিজ্ঞপ্তি ২০২২

Palli Bidyut customers no longer have to stand in line. At the Palli Bidyut office premises / bank booths to pay for pre-paid meter vending or postpaid meter bills. Through Centralized Online Billing / Vending Data Gateway, customers can pay their meter recharge / bill at home. As a result of vending / billing from the customer’s mobile phone using mobile wallets of Robi, Grameenphone, Rocket, etc. So the activities at the vending station of the association have been reduced and on the other hand, there is no customer dissatisfaction. Connect with us in job paper bd.

The Bangladesh Rural Electrification Board provides coordination meetings. Then backyard meetings with customers, exchange of views, online based training through video conferencing with all (60) associations simultaneously. But giving instructions has increased the dynamism of the work. Also at the time of the epidemic corona from which the various meetings through video conferencing are also undergoing training. As a result of which the health risk of the officers / employees has been reduced.

Transformer Maintenance and Load Management (TMLM) software has been implemented by Bapbibo ICT. So directorate to complete the required Maintenance and Load Management by automatically detecting the load of the distributed transformer. Now REB’s ICT Directorate has launched “Palli Bidyut Online Connection System” to reduce the existing problems in traditional electricity connection system. So stop customer harassment, eliminate middlemen and provide satisfactory customer service by saving time and money. The system is running in 60 rural power societies across the country.

Bangladesh Palli Bidyut Circular 2022

The electricity bills of 60 Palli Bidyut Samiti are managed through billing software and the information of electricity bills is communicated to all the customers through SMS. Then implementation of a Unified Integrated Centralized Billing System for 60 Rural Electricity Associations is underway. Bangladesh Palli Bidyut Samity Circular 2021. Information Technology Based Grievance Redressal Management (One Point) is underway to expedite the disposal of various power related grievances of the customers. With One Point, a customer can quickly solve any problem in one place. About 39 million customers of 60 Palli Bidyut Samiti across the country are getting this facility. So it has also added a new dimension to improving the quality of customer service through the mobile app “Palli Bidyut Seba”.

In addition to enhancing the quality of customer service through the use of information technology, BAPBord has taken many steps to establish good governance by enhancing institutional efficiency and transparency and accountabilty. Rural Electrification is an important project to accelerate the overall infrastructure of the rural areas and the socio-economic development of Bangladesh. The country’s policy makers have identified rural electrification as a major program in the rural sector. According to the government’s plan, power supply will be ensured for all citizens of the country by 2020. The Rural Electrification Board (REB) was established in 1986 under the Rural Electrification Board Ordinance No. LI (197) with the aim of electrifying the rural areas of the country and expediting the overall development process.

Bangladesh Palli Bidyut Board Job 2022

According to the ordinance, Dhaka, Narayanganj, Mymensingh, Gazipur, municipal areas of Narsingdi district, areas under RAJUK, industrial areas, Chittagong, Rajshahi, Khulna, Sylhet and Barisal divisional cities and other district towns and cantonments already electrified by Bangladesh Power Development Board (BUBO). Apart from the university areas, other areas of the country have come under the jurisdiction of REB. The REB-affiliated Palli Bidyut Samiti (PBS), formed on the basis of the universal policy of cooperatives, has been formed as a democratic, decentralized and autonomous body, where its members enjoy equal opportunities and equal rights. The continued support of the public, government and donor agencies involved in this program, and the provision of transparency and accountability in comparative jurisprudence, have contributed to the achievement of high standards in the conduct of organizational activities of associations.

The Rural Electrification Board is a government agency responsible for supplying electricity to rural areas of Bangladesh. The board constituted by a government ordinance in 1986 and started construction and distribution of power transmission lines from the beginning of 1986. Although the REB headquartered in Dhaka, all its activities carried out through Palli Bidyut Samitis formed on a cooperative basis. Rural electricity associations are autonomous. Its members are the consumers of electricity in the respective areas and they all enjoy equal rights. All their views on the construction of power transmission lines or the establishment of power plants accepted in a democratic manner. As of March 2011, a total of 60 rural power associations have been formed across the country at the initiative of REB.

Bangladesh Palli Bidyut Job Information 2022

Through these associations, electricity has been provided to 46,748 villages in 433 upazilas of 61 districts across the country. Under the initiative of these associations, a total of 63,29,756 power connections have been provided through 2,22,60 km of power lines and 427 sub-stations including household, agricultural, industrial and commercial establishments. Even a quarter of a century ago, the existence of electricity in the rural areas of Bangladesh was unimaginable. Electricity transmission and distribution activities were limited to urban areas only. Now that electricity has reached the villages, the people of the villages have benefited, increasing their job opportunities. About 2,40,542 irrigation pumps in rural Bengal are now running on electricity. Besides, 1,32,983 small and cottage industrial units, 7,07,941 shops and commercial establishments and 13,942 other establishments in rural areas got electricity connection.

In Bangladesh, the rural electrification program has achieved commendable success compared to other utility-service activities. The average system loss rate in rural power societies is about 14.50%. However, some associations have reduced this rate to 10%. Strict adherence to transparency and accountability and the unwavering support of government and donor agencies have contributed to the achievement of excellent quality of performance of the Rural Electrification Board. Of course, the role of the members of the association and the customers is also important. Behind this achievement of REB was the launch of the Performance Target Agreement. This agreement has given impetus to increase the quality of work performed by each Palli Bidyut Samiti.

Palli Bidyut Board chakrir khobor 2022

Under the agreement, at the beginning of each financial year, the REB sets the performance targets of each of the power associations in some important sectors through bargaining and signs an agreement. If a Palli Bidyut Samiti is able to achieve certain targets, its employees get a bonus of up to 15 per cent of their basic salary. On the other hand, if the target not achieved, the salary of the employees of the concerned association deducted up to one percent. The Palli Bidyut Samitis under REB mainly buy electricity from the Bangladesh Power Development Board and supply it to the rural areas. But the growing demand of the rural consumers not met by the Power Development Board. Later the Rural Electrification Board also got permission to generate electricity. In 1994, a public limited company called Rural Power Company Limited or RPCL formed with the participation of REB.

Its five subordinate rural power societies. With the financial support and guidance of the Asian Development Bank. The company took the initiative to set up a gas-fired power plant in the Mymensingh region. In the first phase of the project, two plants with a capacity of 35 MW set up in 1999. Following the success of this project, the second phase of the project implemented. In the following year with the participation of four more new Palli Bidyut Samiti. At present Mymensingh Power Plant generates up to 150-155 MW of electricity. In the meantime, an initiative taken to set up a steam turbine power plant. A capacity of 60 MW under the third phase of the project. If constructed, the total generation capacity of RPCL’s Mymensingh power plant will be 210 MW.

Job related

“পল্লী বিদ্যুৎ নিয়োগ বিজ্ঞপ্তি ২০২২, পল্লী বিদ্যুৎ বোর্ড জব ২০২২, বাংলাদেশ পল্লী বিদ্যুৎ বোর্ড চাকরি ২০২২, পল্লী বিদ্যুৎ বোর্ড নতুন চাকরি ২০২২, অল পল্লী বিদ্যুৎ জব নোটিশ ২০২২, লেটেষ্ট পল্লী বিদ্যুৎ বোর্ড নিয়োগ বিজ্ঞপ্তি ২০২২, সরকারি চাকরির বিজ্ঞপ্তি ২০২২, সকল বাংলাদেশ পল্লী বিদ্যুৎ বোর্ড নিয়োগ ২০২২, পল্লী বিদ্যুৎ বোর্ড, বাংলাদেশ পল্লী বিদ্যুৎ বোর্ড, নতুন পল্লী বিদ্যুৎ চাকরি.”

“Palli Bidyut Job Notification 2022, PRAN RFL Group Job, Palli Bidyut Board Job 2022, Bangladesh Palli Bidyut Board Job 2022, Cantonment Public School and College Job, Palli Bidyut Board New Job 2022, NRB Bank Limited Job Circular 2022, All Palli Bidyut Job Notice 2022, Latest Palli Bidyut Board Recruitment Notification 2022, Government Job Notification 2021, Atomic Energy Commission Circular 2022, All Bangladesh Palli Bidyut Board Recruitment 2022, Palli Bidyut Board, Bangladesh Palli Bidyut Board, New Palli Bidyut Jobs. ”

Leave a Reply

Back to top button
error: Content is protected !!